Front-panel identity
Request the exact model and revision label plus a straight-on port photograph. Compare the physical port groups and uplinks with the matching manufacturer drawing.
Cisco · Networking
40/100GbE aggregation switch: up to 32×40G or 16×100G, with paired-port allocation.
Plan uplinks and software for this exact model. Hardware condition, included modules and current availability will be confirmed in your quotation.
40/100GbE aggregation switch: up to 32×40G or 16×100G, with paired-port allocation.
Physical ports & licensing
Keep the base network license, management subscription and port assignments separate. Settings below describe each selected device, not additional hardware.
Select a physical cage, then assign its role and rate. Numbers are the front-panel planning sequence, not IOS XE interface names. Uplinks, SVL and DAD consume the same port budget.
QSFP28 · 40 / 100 GbE · Network ports
Physical cage 1 · QSFP28
100G uses odd-numbered upper-row cages and occupies the adjacent 40G cage. SVL/DAD must use native 40G on cages 1–24 or native 100G on 25, 27, 29, 31. No breakout.
Interactive topology
0
Assigned data ports · switch 1
0
Assigned upstream ports · switch 1
32
Unassigned physical cages · switch 1
One planned connection per device pair. Dashed links are unconfigured. Rate is a port capability, not guaranteed throughput. Upstream models and transceivers are not yet selected. This is not a stacking or Virtual Chassis group.
Listed interface rates are not a throughput guarantee. Confirm optics, cable type, FEC, breakout support and software release for the intended links.
Expand an option for its functions, term and ordering requirements. Support services do not grant software features.
Confirm the exact hardware variant, airflow, installation kit and software requirements before ordering.
Attach a photo brief to the request for Cisco C9500-32QC. This is a checklist to agree, not a record that inspection has already been performed.
Request the exact model and revision label plus a straight-on port photograph. Compare the physical port groups and uplinks with the matching manufacturer drawing.
Request PSU, fan and airflow labels, AC or DC input details, rack ears and included optics or cables. Record exclusions as separate line items.
Product photography should show the standalone device, with no boot monitor. Request console or management records separately where appropriate, with private identifiers shared through the agreed channel.
Record port speeds, media type and uplink quantities.
This guide adds the decisions, documents and next steps that support this page.
Network equipment
Count access ports and uplinks separately; state breakout needs.
Network equipmentSpecify interfaces, throughput test conditions and required software features.
Network plannerMatch connector, fiber, reach, wavelength and supported coding.
Network checklistRecord port speeds, media type and uplink quantities.
Match airflow direction, power supply and rack requirements.
Request license and transferability details for the exact offer.
A planning sequence, not a record of completed work.
Counts show records in the site catalog. They do not represent stock, available quantities or verified compatibility.
Snapshot: 2026-09-15
| Decision | Record in your brief | Evidence to retain |
|---|---|---|
| Port map | Record port speeds, media type and uplink quantities. | Complete identifier and source revision |
| Airflow & power | Match airflow direction, power supply and rack requirements. | Platform document or written clarification |
| Software entitlement | Request license and transferability details for the exact offer. | Offered-unit details and agreed scope |
Tick items as you prepare them. This is your personal checklist, not a hardware validation.
Saved in this browser when local storage is available.
Reference-based generated scenes; actual-unit photos are available only through an explicit unit-specific request. Related models are separate catalog records, not substitutes for the item on this page.
Continue the relevant directory or service flow.
Open resourceUse the connected tool to develop the requirement.
Open resourceRetain the supporting reference with your project brief.
Open resourcePort and uplink schedule drafted · Optics and cable ends identified · Airflow and PSU scope confirmed · Required software entitlement listed.