C1200-8FP-2G
Network switches
- Main port layout
- 8 x 1GbE RJ45 PoE+
- Additional / shared ports
- 2 x 1GbE copper/SFP shared pairs
- Mounting
- Rack-mountable
- Switching capacity
- 20 Gbps
6 fields with OEM source evidence
One route through servers, network equipment and components. Start with the model or narrow the catalogue around your project.


Product identities, not available stock.
Open each record to review field scope and remaining checks.
Showing 1–24 of 101,798
Plan a configurationNetwork switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Network switches
6 fields with OEM source evidence
Keep the manufacturer's full identifier and configuration constraints together. Your shortlist is a starting point for a specific quotation.
Review source links, field status and any conflicting or missing specifications.
Record the target system, quantity, accessories, software and site constraints.
Confirm condition, current-unit photos, inclusion list and delivery terms with the quotation.
Define workload, capacity, constraints and growth needs.
This guide adds the decisions, documents and next steps that support this page.
System configurator
Start with the chassis and its documented dependencies.
System configuratorKeep identifiers and evidence side by side.
Compare recordsBuild a port, optics and cable schedule.
Network plannerDefine workload, capacity, constraints and growth needs.
Check component support, physical fit, power and firmware.
Export a reviewable requirement or quotation draft.
A planning sequence, not a record of completed work.
Counts show records in the site catalog. They do not represent stock, available quantities or verified compatibility.
Snapshot: 2026-11-03
| Decision | Record in your brief | Evidence to retain |
|---|---|---|
| Requirements | Define workload, capacity, constraints and growth needs. | Complete identifier and source revision |
| Dependencies | Check component support, physical fit, power and firmware. | Platform document or written clarification |
| Review output | Export a reviewable requirement or quotation draft. | Offered-unit details and agreed scope |
Tick items as you prepare them. This is your personal checklist, not a hardware validation.
Saved in this browser when local storage is available.
Reference-based generated scenes; actual-unit photos are available only through an explicit unit-specific request. Related models are separate catalog records, not substitutes for the item on this page.
Continue the relevant directory or service flow.
Open resourceUse the connected tool to develop the requirement.
Open resourceRetain the supporting reference with your project brief.
Open resourceWorkload requirements captured · Candidate BOM recorded · Open compatibility questions listed · Reviewer and next action assigned.