CPUs
Xeon and EPYC parts across Scalable and older generations, with steppings identified.

Browse this section
Browse the Server Memory page for product families, configuration notes and quotation paths.
Open page 02Browse the SSD, HDD & NVMe page for product families, configuration notes and quotation paths.
Open page 03Browse the RAID & HBA Controllers page for product families, configuration notes and quotation paths.
Open page 04Browse the Storage & Memory Catalog page for product families, configuration notes and quotation paths.
Open pageCapabilities
Xeon and EPYC parts across Scalable and older generations, with steppings identified.
RDIMM/LRDIMM by capacity, rank and speed — validated against platform rules.
HDD, SSD, RAID/HBA cards and cache modules as exact option parts.
Redundant power and cooling matched to wattage and chassis generation.
PCIe risers, backplanes and midplanes for exact chassis rebuilds.
Core parts are photographed on the workbench during intake.
How it works
Exact OEM part number lookup across the parts index.
Platform and generation rules checked by the sourcing team.
Real intake photos of the actual part where available.
Add parts to a combined RFQ with systems and media.
From the facility





Model, MPN, generation, chassis layout and selected options are separated before a commercial offer.
Factory-new, OEM-program and inspected pre-owned supply paths are shown separately where relevant.
Quantity, accessories, licenses, packing, lead time and delivery route are confirmed before shipment.
Common questions
Use the OEM option PN from the server's maintenance manual, or send a photo of the existing part label.
Pulled CPUs, memory and controllers are bench-tested; results are noted on the quotation.
Yes — field-replaceable units ship as complete assemblies with part number verification.
Both — single spare parts and project batches follow the same quotation path.
Explore the rest of this section
Need an exact model or PN?
ASTER RACKIT can work from a BOM, model list, part number, configuration target or replacement requirement.