HP 468330-002-HIGH P — Ethernet network adapter
- Title-derived · network rate/connector
- Sfp
Title-derived fields · unverified
Compare the fields actually recorded, preserve complete part-number suffixes and carry your choices into a local RFQ.
HP 468330-002-HIGH P — Ethernet network adapter
Title-derived fields · unverified
HP 468332-B21-HIGH P — Ethernet network adapter
Title-derived fields · unverified
HP 516937-B21-HIGH P — Ethernet network adapter
Title-derived fields · unverified
HP 516937-B21-LOW P — Ethernet network adapter
Title-derived fields · unverified
HP 518001-001-HIGH P — Ethernet network adapter
Title-derived fields · unverified
HP 592520-B21-HIGH P — InfiniBand / VPI host adapter
Title-derived fields · unverified
HP 593717-B21-HIGH P — Ethernet network adapter
Title-derived fields · unverified
HP 614203-B21-HIGH P — Ethernet network adapter
Title-derived fields · unverified
HP 649108-001-HIGH P — Converged network adapter
Title-derived fields · unverified
HP 649281-B21-HIGH P — InfiniBand / VPI host adapter
Title-derived fields · unverified
HP 656089-001-HIGH P — InfiniBand / VPI host adapter
Title-derived fields · unverified
HP 788995-B21-HIGH P — Ethernet network adapter
Title-derived fields · unverified
HP 872725-B21-HIGH P — Ethernet network adapter
Title-derived fields · unverified
HP MCX354A-FCBT-HP-HIGH P — InfiniBand / VPI host adapter
Title-derived fields · unverified
HP P08456-001-HIGH P — Ethernet network adapter
Title-derived fields · unverified
HP 864985-001 — Network adapter
Single-supplier identity observation · technical parameters unverified
HP 935683-001 — Network adapter
Single-supplier identity observation · technical parameters unverified
HP 844780-001 — Network adapter
Single-supplier identity observation · technical parameters unverified
HP 629135-B21 — Network adapter
Single-supplier identity observation · technical parameters unverified
HP 684208-B21 — Network adapter
Single-supplier identity observation · technical parameters unverified
HP 665238-001 — Network adapter
Single-supplier identity observation · technical parameters unverified
HP 684217-B21 — Network adapter
Single-supplier identity observation · technical parameters unverified
HP 800369-001 — Network adapter
Single-supplier identity observation · technical parameters unverified
HP 768726-001 — Network adapter
Single-supplier identity observation · technical parameters unverified
Record port speeds, media type and uplink quantities.
This guide adds the decisions, documents and next steps that support this page.
Network equipment
Count access ports and uplinks separately; state breakout needs.
Network equipmentSpecify interfaces, throughput test conditions and required software features.
Network plannerMatch connector, fiber, reach, wavelength and supported coding.
Network checklistRecord port speeds, media type and uplink quantities.
Match airflow direction, power supply and rack requirements.
Request license and transferability details for the exact offer.
A planning sequence, not a record of completed work.
Counts show records in the site catalog. They do not represent stock, available quantities or verified compatibility.
Snapshot: 2026-11-03
| Decision | Record in your brief | Evidence to retain |
|---|---|---|
| Port map | Record port speeds, media type and uplink quantities. | Complete identifier and source revision |
| Airflow & power | Match airflow direction, power supply and rack requirements. | Platform document or written clarification |
| Software entitlement | Request license and transferability details for the exact offer. | Offered-unit details and agreed scope |
Tick items as you prepare them. This is your personal checklist, not a hardware validation.
Saved in this browser when local storage is available.
Reference-based generated scenes; actual-unit photos are available only through an explicit unit-specific request. Related models are separate catalog records, not substitutes for the item on this page.
Continue the relevant directory or service flow.
Open resourceUse the connected tool to develop the requirement.
Open resourceRetain the supporting reference with your project brief.
Open resourcePort and uplink schedule drafted · Optics and cable ends identified · Airflow and PSU scope confirmed · Required software entitlement listed.