TYAN
TYAN Transport HX TS75-B8252
A proven AMD EPYC platform for HPC, virtualization and high-capacity storage deployments.
Model presentation · exact unit photos with quotePlatform highlights
Clear condition, flexible options, quality checks, professional export packing and worldwide freight coordination.



Server platform buying guide
Configure the system around workload, site and growth plans.
Server selection starts with workload and chassis class, then moves through CPU, memory, storage, PCIe, network, power, rack and lifecycle decisions.
Enterprise infrastructure teams
Refresh, virtualization, database and private-cloud projects that need dependable configuration detail.
Cloud, hosting and data-center operators
Repeatable rack platforms, spare pools and multi-site capacity expansion.
Integrators and resellers
New and tested pre-owned systems prepared with options, accessories and export support.
Before we quote
The information that turns a request into the right offer.
You can start with partial information. These are the decisions our team closes with you before order confirmation.
Inside the supply process
Product, configuration and delivery shown in context.



What appears on the offer
Commercial detail buyers can approve with confidence.
Claims are tied to the exact model, serial status, configuration and destination shown on the quotation.
The offer separates the main unit, selected options, required accessories and any software or subscription items.
Condition, included rails, bezels, caddies, cables, documentation and packaging are stated before order confirmation.
Selected parts are checked against current manufacturer documentation and available configuration tools.
Validation, allocation, testing, packing, export clearance and transit are shown as separate milestones.
Provider, duration, service level, covered geography and material exclusions appear on the quote.
The offer or sales contract states the DOA notice window, written RMA process, return-freight responsibility, inspection or restocking charges, non-returnable configured or licensed items, remedy and return location.
The named destination, packed size, freight method and quoted Incoterms® 2020 rule are recorded clearly.
Project path
From requirement to international delivery.
Tell us what must work
Send the model, workload, quantity, preferred condition, deadline and destination.
Review the technical fit
We close configuration, compatibility, licensing, power, accessories and acceptable alternatives.
Approve the documented offer
You review availability, condition, inclusions, warranty, timeline, packing and freight terms.
Prepare, pack and hand over
Testing or seal review, photos, protective packing, export documents and carrier handover follow the approved scope.
Buyer questions
Answers before the first purchase order.
Can I request a mixed list from several brands?
Yes. Send one spreadsheet or message. We separate servers, networking and components into the right technical review, then return a consolidated commercial offer.
How is availability confirmed?
Availability and lead time are confirmed after the exact model, configuration, condition, quantity, destination and compliance review are complete.
Are software licenses included with the hardware?
Only when they are itemized and confirmed on the quote. Hardware ownership does not automatically transfer subscriptions, management entitlements or feature activations.
What warranty is included?
The quote states whether coverage is provided by the manufacturer, a channel partner or ASTER RACKIT, together with duration, region, service level and exclusions.
How is equipment protected for international transit?
We use serviceable OEM packaging where available, or ESD protection, immobilizing foam, double-wall cartons, pallets or crates selected for the unit weight and route.
How do returns and RMA requests work?
Terms vary for factory-new channel goods, configured systems, licensed products and international pre-owned orders. Before purchase, the quote or sales contract states the DOA notice window, written RMA authorization, return-freight responsibility, inspection or restocking charges, non-returnable items, available remedy and cross-border return point. No return is accepted without written RMA approval; the signed commercial terms control.



