Enterprise hardware · New & pre-owned supply
sales@aster-rackit.com English / Global
ProductsView all products
BrandsView all brands
SolutionsView all solutions
ServicesView all services
Resources
AboutView all about
Request a quote
Factory new3U · 8-GPU platform

Lenovo

Lenovo ThinkSystem SR675 V3

A 3U AI and deep-learning platform for 8-GPU training nodes, H800 / RTX-class accelerator requests, enterprise inference and high-density AI projects.

Lenovo ThinkSystem SR675 V3 3U 8-GPU server on inspection benchModel presentation · exact unit photos with quote
SUPPLY CONDITIONFactory new
PACKING SUPPORTFactory-new Lenovo ThinkSystem supply with original packaging, pallet protection and accessory review
QUOTE SUPPORTModel, quantity and delivery planning

Platform highlights

013U chassis for up to 8 GPUs
02Dual AMD EPYC processors
0324 DDR5 DIMM slots
04PCIe Gen5 expansion
05Six M.2 / EDSFF NVMe options by configuration
06Four 1800W hot-swap PSUs on this arrival batch
ASTER RACKIT supply support

Clear condition, flexible options, quality checks, professional export packing and worldwide freight coordination.

Lenovo SR675 V3 stock in warehouse
Original carton stockLenovo SR675 V3 stock in warehouse
Lenovo pallets beside receiving truck
Batch arrivalLenovo pallets beside receiving truck
Open Lenovo carton with foam and accessories
Accessory confirmationOpen Lenovo carton with foam and accessories

Server platform buying guide

Configure the system around workload, site and growth plans.

Server selection starts with workload and chassis class, then moves through CPU, memory, storage, PCIe, network, power, rack and lifecycle decisions.

01

Enterprise infrastructure teams

Refresh, virtualization, database and private-cloud projects that need dependable configuration detail.

02

Cloud, hosting and data-center operators

Repeatable rack platforms, spare pools and multi-site capacity expansion.

03

Integrators and resellers

New and tested pre-owned systems prepared with options, accessories and export support.

Before we quote

The information that turns a request into the right offer.

You can start with partial information. These are the decisions our team closes with you before order confirmation.

DecisionWhat we reviewWhat you receive
Workload and scaleApplications, users, VMs, databases, data set, growth and availability targetA suitable platform and generation shortlist
Compute and memoryCPU family/core count, accelerator need, memory capacity and populationA valid processor and DIMM direction
Storage and I/OBay layout, media, RAID/HBA, PCIe, NIC speed and expansionA complete option schedule
Rack and lifecycleDepth, power, cooling, rails, support, condition and destinationDeployment and commercial notes

Inside the supply process

Product, configuration and delivery shown in context.

Mainstream 2U enterprise platform for Lenovo ThinkSystem SR675 V3
Mainstream 2U enterprise platformA versatile class for virtualization, database and private-cloud projects.
Modular and high-density compute for Lenovo ThinkSystem SR675 V3
PLANNING CONTEXT · EXACT PRODUCT PHOTOS SUPPLIED BEFORE ORDERModular and high-density computeChassis-level planning for standardized fleets and shared fabrics.
Inventory and project preparation for Lenovo ThinkSystem SR675 V3
PLANNING CONTEXT · EXACT PRODUCT PHOTOS SUPPLIED BEFORE ORDERInventory and project preparationConfiguration, quantity and packing move together through the supply process.

What appears on the offer

Commercial detail buyers can approve with confidence.

Claims are tied to the exact model, serial status, configuration and destination shown on the quotation.

01A clear final bill of materials

The offer separates the main unit, selected options, required accessories and any software or subscription items.

02Condition and inclusion statement

Condition, included rails, bezels, caddies, cables, documentation and packaging are stated before order confirmation.

03Compatibility review

Selected parts are checked against current manufacturer documentation and available configuration tools.

04Indicative project timeline

Validation, allocation, testing, packing, export clearance and transit are shown as separate milestones.

05Warranty path in writing

Provider, duration, service level, covered geography and material exclusions appear on the quote.

06Return and RMA terms

The offer or sales contract states the DOA notice window, written RMA process, return-freight responsibility, inspection or restocking charges, non-returnable configured or licensed items, remedy and return location.

07Delivery and Incoterm detail

The named destination, packed size, freight method and quoted Incoterms® 2020 rule are recorded clearly.

Project path

From requirement to international delivery.

01

Tell us what must work

Send the model, workload, quantity, preferred condition, deadline and destination.

02

Review the technical fit

We close configuration, compatibility, licensing, power, accessories and acceptable alternatives.

03

Approve the documented offer

You review availability, condition, inclusions, warranty, timeline, packing and freight terms.

04

Prepare, pack and hand over

Testing or seal review, photos, protective packing, export documents and carrier handover follow the approved scope.

Buyer questions

Answers before the first purchase order.

Can I request a mixed list from several brands?

Yes. Send one spreadsheet or message. We separate servers, networking and components into the right technical review, then return a consolidated commercial offer.

How is availability confirmed?

Availability and lead time are confirmed after the exact model, configuration, condition, quantity, destination and compliance review are complete.

Are software licenses included with the hardware?

Only when they are itemized and confirmed on the quote. Hardware ownership does not automatically transfer subscriptions, management entitlements or feature activations.

What warranty is included?

The quote states whether coverage is provided by the manufacturer, a channel partner or ASTER RACKIT, together with duration, region, service level and exclusions.

How is equipment protected for international transit?

We use serviceable OEM packaging where available, or ESD protection, immobilizing foam, double-wall cartons, pallets or crates selected for the unit weight and route.

How do returns and RMA requests work?

Terms vary for factory-new channel goods, configured systems, licensed products and international pre-owned orders. Before purchase, the quote or sales contract states the DOA notice window, written RMA authorization, return-freight responsibility, inspection or restocking charges, non-returnable items, available remedy and cross-border return point. No return is accepted without written RMA approval; the signed commercial terms control.