Skip to content
Enterprise hardware · New & pre-owned supply
sales@aster-rackit.comEnglish / Global
Quote basket 0Configure system →
☰
EXACT IDENTIFIERS · CONNECTED TOOLS

GIGABYTE / Storage arrays & expansion

Compare the fields actually recorded, preserve complete part-number suffixes and carry your choices into a local RFQ.

Storage array bays during verification
Storage array bays during verification
brand: gigabytecategory: storage
GIGABYTEmodel
CMT4032

GIGABYTE CMT4032 — Storage arrays & expansion

Ports
2 x M.2 sockets: - M-key - PCIe Gen3 x4 [1] - Support 2280/22110 cards [1] Only support NVMe SSDs.
Controller
N/A
Interface
PCIe x8 (Gen3 x8)

Inherited technical record

View details →
GIGABYTEmodel
CMT4034

GIGABYTE CMT4034 — Storage arrays & expansion

Ports
4 x M.2 sockets: - M-key - PCIe Gen3 x4 [1] - Support 2280/22110 cards [1] Only support NVMe SSDs.
Controller
N/A
Interface
PCIe x16 (Gen3 x16)

Inherited technical record

View details →
GIGABYTEmodel
CMT40A0

GIGABYTE CMT40A0 — Storage arrays & expansion

Host interface
PCIe x8 (Gen5 x8)
Dimensions (mm)
68.9 x 150 mm
Card format
Low-Profile card

Inherited technical record

View details →
GIGABYTEmodel
CMTP1C2

GIGABYTE CMTP1C2 — Storage arrays & expansion

Host interface
PCIe x16 (Gen5 x16)
Dimensions (mm)
111.15 x 234 mm
Card format
Full-Height Full-Length card

Inherited technical record

View details →
01

Storage & drive systems — the next decisions

GIGABYTE / Storage & drive systems

Storage & drive systems

Trace host adapter, backplane, cable and physical drive interface.

This guide adds the decisions, documents and next steps that support this page.

Drive & memory search
Storage & drive systems illustrative environment
02

Choose the right route

03

Details that change the configuration

Drive path

Trace host adapter, backplane, cable and physical drive interface.

Capacity & endurance

Separate raw capacity from usable capacity and workload requirements.

Firmware & carriers

Confirm OEM firmware, sector format and tray requirements explicitly.

04

From requirement to handover

  1. 01

    Describe storage workload

  2. 02

    Select interface & media

  3. 03

    Review system path

  4. 04

    Define acceptance checks

A planning sequence, not a record of completed work.

05

Explore the relevant catalog

GIGABYTE

Recorded catalog identities

Counts show records in the site catalog. They do not represent stock, available quantities or verified compatibility.

Snapshot: 2026-09-15

06

Compare the buying requirements

Storage & drive systems comparison brief
DecisionRecord in your briefEvidence to retain
Drive pathTrace host adapter, backplane, cable and physical drive interface.Complete identifier and source revision
Capacity & enduranceSeparate raw capacity from usable capacity and workload requirements.Platform document or written clarification
Firmware & carriersConfirm OEM firmware, sector format and tray requirements explicitly.Offered-unit details and agreed scope
Open the comparison workspace
07

Build your readiness checklist

Your preparation progress

Tick items as you prepare them. This is your personal checklist, not a hardware validation.

0 / 4 prepared0

Saved in this browser when local storage is available.

08

A closer look at the hardware

Storage & drive systems — Nvme U2 Lineup facility reference
Nvme U2 Lineup Explore
Storage & drive systems — Storage Array Dense facility reference
Storage Array Dense Explore
1 / 2

Reference-based generated scenes; actual-unit photos are available only through an explicit unit-specific request. Related models are separate catalog records, not substitutes for the item on this page.

09

Keep the supporting material together

Drive & memory search

Continue the relevant directory or service flow.

Open resource

Drive-path checklist

Retain the supporting reference with your project brief.

Open resource
10

Turn the brief into the next step

GIGABYTE / Storage & drive systems

Keep the requirement specific.

Full model and suffix preserved · Interface and sector format specified · Carrier and firmware scope recorded · Usable-capacity requirement stated.