System planning
Start with the chassis and its documented dependencies.
System configuratorSelect up to four identities. Matching a field does not establish replacement compatibility.
| Recorded field | ThinkAgile VX650a V4Lenovo |
|---|---|
| Identity type | model |
| Evidence status | OEM fields reviewed · see remaining checks |
| OEM review · chassis | 2U rack based on ThinkSystem SR650a V4 |
| OEM review · cpu | One or two Intel Xeon 6700P/6500P processors; up to 350 W TDP |
| OEM review · gpu layout | Up to eight single-wide or four double-wide GPUs; table lists eight L4, four L40S or two H200 NVL |
| OEM review · memory | 32 DDR5 slots with two processors; up to 8 TB using 256 GB 3DS RDIMMs |
| OEM review · storage | Up to eight 2.5-inch or E3.S NVMe bays; M.2 boot options |
| OEM review · network | Two OCP 3.0 positions and up to six PCIe network adapters |
| OEM review · management interface | XClarity Controller 3; rear dedicated RJ45 1GbE port, optional second management port |
| OEM review · power | Up to two redundant hot-swap supplies; listed options range from 800 W to 3200 W |
Define workload, capacity, constraints and growth needs.
This guide adds the decisions, documents and next steps that support this page.
System configurator
Start with the chassis and its documented dependencies.
System configuratorKeep identifiers and evidence side by side.
Compare recordsBuild a port, optics and cable schedule.
Network plannerDefine workload, capacity, constraints and growth needs.
Check component support, physical fit, power and firmware.
Export a reviewable requirement or quotation draft.
A planning sequence, not a record of completed work.
Counts show records in the site catalog. They do not represent stock, available quantities or verified compatibility.
Snapshot: 2026-09-15
| Decision | Record in your brief | Evidence to retain |
|---|---|---|
| Requirements | Define workload, capacity, constraints and growth needs. | Complete identifier and source revision |
| Dependencies | Check component support, physical fit, power and firmware. | Platform document or written clarification |
| Review output | Export a reviewable requirement or quotation draft. | Offered-unit details and agreed scope |
Tick items as you prepare them. This is your personal checklist, not a hardware validation.
Saved in this browser when local storage is available.
Reference-based generated scenes; actual-unit photos are available only through an explicit unit-specific request. Related models are separate catalog records, not substitutes for the item on this page.
Continue the relevant directory or service flow.
Open resourceUse the connected tool to develop the requirement.
Open resourceRetain the supporting reference with your project brief.
Open resourceWorkload requirements captured · Candidate BOM recorded · Open compatibility questions listed · Reviewer and next action assigned.